Must-Know California Generator Regulations & Laws
California generator laws protect public health and keep critical buildings running, but the rules are spread across fire codes, state air regulations, and local permits. Facility managers ask us the same questions all the time. What testing is required? Does the ATS need testing, too? How many hours can we run before we hit our permit limit?
Here’s what the Generator Experts at Duthie Power see in the field every day across Southern California.
How California Regulates Commercial Generators

A commercial standby generator in California can fall under three layers of rules. Which ones apply depends on what the generator powers and how large its engine is.
Fire and Life Safety Standards
NFPA 110 sets the testing and maintenance program for an emergency power supply system. It applies when a generator serves emergency or legally required loads, such as egress lighting, fire pumps, or other life safety systems. The California Fire Code, which is based on the International Fire Code, requires those systems to be maintained under NFPA 110, and your local fire authority enforces it. Generators that only serve optional loads fall outside NFPA 110, though its schedule is still a smart baseline. Hospitals also answer to NFPA 99.
State Air Quality Rules
The California Air Resources Board regulates stationary diesel engines rated above 50 brake horsepower through its Airborne Toxic Control Measure, found in Title 17 of the California Code of Regulations. It sets emission standards, fuel rules, and caps on non-emergency runtime. Federal regulations from the EPA apply as well.
Local Air District Permits
Your local air district enforces the state measure, issues your Permit to Operate, and sets the exact hour limits for your unit. That’s why identical units in neighboring counties can carry different conditions. Our air district permit renewal guide explains the process.
Five NFPA 110 Requirements for Emergency Power Systems
If your generator falls under NFPA 110, these five requirements come up in almost every compliance conversation we have.
1. Exercise the Generator Monthly Under Load
NFPA 110 (2022 edition) section 8.4.2 calls for exercising each diesel generator set at least once a month for 30 minutes or more. The unit needs to carry at least 30 percent of its standby nameplate kW rating or reach the minimum exhaust gas temperature the manufacturer recommends. Too little load can cause wet stacking, where unburned fuel builds up in the exhaust. Learn more about how often to exercise your generator.
2. Add an Annual Load Test When Monthly Runs Fall Short
When a diesel set can’t reach 30 percent during monthly exercise, NFPA 110 section 8.4.2.3 requires an annual supplemental test of at least 1.5 hours. The generator carries at least 50 percent of its nameplate rating for 30 minutes, then at least 75 percent for one hour. A load bank test is the usual way to meet it without disrupting building operations.
3. Test Your ATS Monthly and Maintain It Regularly
NFPA 110 section 8.4.6 requires every transfer switch to be operated monthly, switching to the alternate source and then returning to normal power. Many facilities pair this with the monthly generator exercise. NFPA 110 also calls for routine transfer switch maintenance, including checking connections, looking for signs of overheating, cleaning, and replacing contacts when needed. Most facilities schedule the work once a year through ATS servicing.
4. Check Fuel Quality Every Year
NFPA 110 section 8.3.7 calls for a fuel quality test at least once a year using appropriate ASTM standards. Stored diesel picks up water, microbial growth, and sediment, and bad fuel clogs filters right when the generator needs to run. Diesel fire pumps have a matching annual
requirement under NFPA 25. If fuel tests poorly, the sample results determine the fix: fuel polishing may restore it, while heavier contamination can require professional tank cleaning or full tank replacement.
5. Service Oil and Filters on Schedule
NFPA 110 bases the maintenance program on the manufacturer’s recommendations, and manufacturers set oil service by both run hours and calendar time. Standby units log so few hours that the calendar interval usually comes first, which for many units means an oil and filter change at least once a year. A generator maintenance program keeps these intervals on schedule.
Runtime Limits and Permits by Region

NFPA 110 tells you how often to test. Your air permit tells you how many hours you can spend doing it.
Statewide Limits From CARB
Under the state measure, most new stationary emergency diesel engines may run no more than 50 hours per calendar year for maintenance and testing. A district can allow up to 100 hours for engines at or below 0.01 g/bhp-hr of particulate, a level that generally takes a diesel particulate filter. Older engines with higher emissions can be held to 20 hours. Operation during a real power outage doesn’t count against these caps.
Los Angeles, Orange County, and the Inland Empire
The South Coast Air Quality Management District (SCAQMD) covers all of Orange County and the urban, non-desert portions of Los Angeles, Riverside, and San Bernardino counties. Rule 1470 carries out the state diesel engine requirements here. Standard permit conditions cap total operation at 200 hours per year, with no more than 50 for maintenance and testing, as shown on SCAQMD’s emergency engine permit form. Rule 118.1, adopted in 2021, lets critical service facilities such as hospitals, water plants, and telecommunications sites exclude public safety power shutoff hours from that 200-hour cap. We serve facilities in Los Angeles, Long Beach, Orange County, and the Inland Empire.
San Diego County
The San Diego County Air Pollution Control District permits stationary engines, and emergency units rated 50 bhp or more must meet Rule 69.4.1 along with state and federal rules. Permits limit annual testing hours and may restrict the time of day testing can happen. Our San Diego team works under these rules every day.
Imperial County
The Imperial County Air Pollution Control District requires a Permit to Operate for stationary emergency diesel engines and enforces the state diesel engine measure alongside federal rules. We serve facilities in this area as part of our Southern California coverage.
Ventura County
The Ventura County Air Pollution Control District requires a Permit to Operate for diesel emergency generators rated 50 horsepower or more. As of January 1, 2026, new and replacement emergency diesel engines must meet United States EPA Tier 4 standards. If you’re planning a replacement in Ventura County, factor that in early.
Do the 2028 Portable Generator Rules Affect Your Facility?
Headlines about a California generator ban trace back to AB 1346, a 2021 law that directed CARB to eliminate emissions from new small off-road engines. CARB’s resulting rules set a zero-emission standard for new portable generator engines starting with the 2028 model year.
Those rules cover spark-ignited engines rated at or below 19 kilowatts, and CARB excludes engines in stationary equipment, including standby generators. Existing compliant equipment can stay in use. Diesel generators are compression-ignition engines and fall outside the rule, so the diesel unit protecting your building isn’t affected.
Keeping Your Facility Compliant

Most compliance problems come down to missed intervals and missing paperwork.
- Log every run: record the date, duration, and reason, and separate testing hours from outage hours.
- Keep the hour meter working: CARB requires a non-resettable hour meter on emergency diesel engines.
- Hold records for 36 months: that’s the retention period in CARB’s measure.
- Keep fuel receipts: they show you’re using CARB diesel or an approved alternative fuel.
- Book annual work early: ATS service, fuel testing, and load tests are easier to plan than to rush.
Duthie Power has served Southern California facilities since 1965. Our technicians handle ATS service, fuel testing and polishing, load testing, and repairs on all major makes, with 24/7 emergency service if something fails between visits.
Frequently Asked Questions
Do hours during a utility outage count against our permit limit?
Not against the maintenance and testing cap. CARB treats running during a loss of utility power beyond your control as emergency use. You still need to log those hours, and in SCAQMD they generally count toward the 200-hour annual limit unless Rule 118.1 applies.
Is our diesel emergency unit affected by the 2028 zero-emission rule?
No. That rule applies to new small spark-ignited engines in portable equipment. Stationary diesel generators are regulated through CARB’s diesel engine measure and your air district permit.
Do we need a new permit to replace or relocate a generator?
In most cases, yes. New and replacement engines usually need an Authority to Construct before installation and a Permit to Operate afterward, and they must meet current emission standards. Talk with your air district before you order new equipment or move a generator.
Stay Ahead of Your Next Inspection
Staying compliant with California generator regulations requires more than keeping the equipment running. Regular testing, documented maintenance, ATS servicing, fuel checks, and load bank testing all play a role in keeping your emergency power system prepared.
Duthie Power has served Southern California facilities since 1965, helping commercial and industrial customers maintain reliable backup power systems. Our Generator Experts provide comprehensive generator services, including preventative maintenance, emergency repairs, transfer switch service, load bank testing, fuel testing and polishing, and generator inspections.
Need help with generator testing, ATS service, or maintenance scheduling? Request a quote and our Generator Experts will get your system on track.